1. Translation of the instruction manual h2>
After opening the machine pay attention to maintaining smooth flow of ozone indoors. If there is a malfunction in the gas supply section, the machine should be stopped immediately to prevent heat accumulation in the ozone chamber and damage to the ozone generating components. As part of the failure of gas supply should be immediately shut down to prevent the accumulation of ozone chamber heat, ozone damage to the original. Every day when starting up, the equipment must be checked for air leaks. If there is an air leak, the machine must be stopped and the problem must be resolved before starting up. Device must be checked at boot time every day is leaking, if the leak must be shut down until the problem is resolved in order to boot. Each device installation should leave room for easy disassembly and maintenance, while also being compact and reasonable. The equipment installation should leave room for, both for the demolition and repair, but also compact and reasonable. The entire equipment should ensure smooth air flow (when the valve is controlled, the ozone generator must be turned on and the valve must be opened), and leak proof and anti blocking measures should be taken for each air flow and pipeline. Set of equipment should ensure the smooth flow of gas path (valve control, ozone generator to open, the valve must be opened) and the gas line, pipeline leak need to be taken, aiming to halt the measure. Once you have confirmed that the device has been installed correctly and are familiar with the following content, you can proceed with device operation. When you determine the equipment has been properly installed and are familiar with the following, you can operate the device. Check if the air path is unobstructed and if there are any leaks. Check if the gas line is clear, whether there are leakage areas. If any problems are found, they must be resolved. Found to the problem must be addressed. 1.1. Manual operation: Press the power button, the power indicator light will turn on, and the voltmeter will display the current voltage. Press the manual button, and the whole machine will start working. The manual indicator light will turn on, and the ammeter will display the working current. Manual work boot: press the power button, power indicator light, voltage meter to indicate the current-voltage, press the manual button, machine work, hand indicator light, ammeter display operating current. The whole machine starts working. Machine to work. Shutdown: First press the manual button to stop the machine from working, then press the power switch to cut off the power. Shutdown: First press the manual button, machine stop working, and then press the power switch, shut off power. 2. 2. Automatic operation Press the power button, the power indicator is on, and the voltmeter indicates the current voltage. Press the automatic operation button, and then adjust the electronic time control. The machine will work according to the adjustment time. Work automatically press the power button, power indicator light, voltage meter to indicate the current-voltage, press the button work automatically, and then adjust when the control electronics, the machine will adjust the time according to their work. The ammeter displays the operating current. Ammeter display operating current will stop working after the set time. To set the time will stop working. Finally, press the power switch. Finally

Current position >About Us